Skip to content

Pull requests: metal3-io/baremetal-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

✨ Add RBAC files for metrics authentication and authorization lgtm Indicates that a PR is ready to be merged. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2145 opened Dec 20, 2024 by kashifest Loading… BMO - v0.8
🌱 Add release github workflow do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. needs-rebase Indicates that a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#2132 opened Dec 17, 2024 by mquhuy Loading…
🌱 E2E: Revert temporary pinning of Ironic do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#2113 opened Dec 9, 2024 by lentzi90 Loading…
🐛 Fix listing ironic node ports with empty mac address ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#2088 opened Nov 28, 2024 by hex2dec Loading…
draft: add namespace scoped operator mode do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. needs-rebase Indicates that a PR cannot be merged because it has merge conflicts with HEAD. size/XL Denotes a PR that changes 500-999 lines, ignoring generated files.
#1867 opened Aug 9, 2024 by NymanRobin Loading…
2 of 7 tasks
WIP: 🌱 Use equinix runner instead of ubuntu for e2e tests do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#1775 opened Jun 7, 2024 by kashifest Loading…
🌱 Remove hack/tools go module do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. needs-rebase Indicates that a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#1753 opened May 30, 2024 by mquhuy Loading…
ProTip! Adding no:label will show everything without a label.