Skip to content

Basic nav1 fleet adapter setup done #62

Basic nav1 fleet adapter setup done

Basic nav1 fleet adapter setup done #62

Triggered via push December 30, 2024 09:17
Status Failure
Total duration 3m 2s
Artifacts

unit-tests.yaml

on: push
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 2 warnings
unit-tests (rolling)
The process '/usr/bin/bash' failed with exit code 1
unit-tests (jazzy)
The job was canceled because "rolling" failed.
unit-tests (rolling)
Unexpected input(s) 'integration-testing', valid inputs are ['ros-distribution', 'zenoh-version', 'nav1-integration-testing', 'nav2-integration-testing']
unit-tests (jazzy)
Unexpected input(s) 'integration-testing', valid inputs are ['ros-distribution', 'zenoh-version', 'nav1-integration-testing', 'nav2-integration-testing']