Skip to content

Commit

Permalink
remove incomplete iea weo mapping
Browse files Browse the repository at this point in the history
  • Loading branch information
fbenke-pik committed Aug 29, 2024
1 parent bb12335 commit 8c08154
Showing 1 changed file with 1 addition and 1 deletion.
Original file line number Diff line number Diff line change
Expand Up @@ -59,7 +59,7 @@ CO2 process stored-Modern bioenergy: liquid-Biofuels production (Mt CO2);;
CO2 total captured-Total-Total energy supply (Mt CO2);;
CO2 total intensity-Electricity-Electricity generation (gCO2 per kWh);;
CO2 total removed-Total-Biofuels production and direct air capture (Mt CO2);;
CO2 total removed-Total-Total energy supply (Mt CO2);Emi|CO2|CDR|BECCS (Mt CO2/yr);-1
CO2 total removed-Total-Total energy supply (Mt CO2);;
CO2 total-Total-Total energy supply (Mt CO2);;
Economic indicators-Floorspace-Services (Million square meters);;
Economic indicators-Total-GDP per capita (USD per capita (2022, PPP));;
Expand Down

0 comments on commit 8c08154

Please sign in to comment.