Skip to content

Test nagfor

Test nagfor #623

Triggered via schedule September 14, 2024 19:05
Status Failure
Total duration 11h 52m 35s
Artifacts 8

test_nagfor.yml

on: schedule
Matrix: Run nagfor tests
check_success_timeout
13s
check_success_timeout
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Run nagfor tests (i2, bobyqa, small)
The job running on runner zM0 has exceeded the maximum execution time of 360 minutes.
Run nagfor tests (i2, bobyqa, small)
The operation was canceled.
Run nagfor tests (i2, lincoa, big)
The job running on runner zS0 has exceeded the maximum execution time of 360 minutes.
Run nagfor tests (i2, lincoa, big)
The operation was canceled.
Run nagfor tests (i2, newuoa, big)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Run nagfor tests (i2, newuoa, big)
The operation was canceled.
Run nagfor tests (i2, newuoa, small)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Run nagfor tests (i2, newuoa, small)
The operation was canceled.
check_success_timeout
Process completed with exit code 42.

Artifacts

Produced during runtime
Name Size
bobyqa-i2-big--g
14 KB
bobyqa-i2-small--g
214 KB
cobyla-i2-big--g
82.8 KB
cobyla-i2-small--g
148 KB
lincoa-i2-big--g
266 KB
lincoa-i2-small--g
2.72 MB
uobyqa-i2-big--g
3.97 KB
uobyqa-i2-small--g
20.6 KB