Skip to content

Commit

Permalink
Bumped version number of cost calculation dashboard
Browse files Browse the repository at this point in the history
  • Loading branch information
bwbush committed Jan 3, 2025
1 parent fa99a12 commit 00c7466
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion cost-dashboard/index.html
Original file line number Diff line number Diff line change
Expand Up @@ -10,7 +10,7 @@
<div id="uiHeader">
<div>
<h1>Ouroborous Leios cost estimator</h1>
<h2>v0.2, <small><a href="https://drive.google.com/file/d/1pH1GYRInevlKcrkpFRJYIvRqFtcv3yFd/view?usp=sharing">video tutorial</a></small></h2>
<h2>v0.3, <small><a href="https://drive.google.com/file/d/1pH1GYRInevlKcrkpFRJYIvRqFtcv3yFd/view?usp=sharing">video tutorial</a></small></h2>
</div>
<p><em>Explore the costs and benefits of Ouroborous Leios</em></p>
<p>WARNING: This is a <em>very preliminary</em> tool for estimating the costs of running Leios nodes. At this point, it is really just useful for structuring thinking about Leios costs and making some very rough calculations for guiding further study. The Leios R&amp;D task aims to refine both the inputs to models like this and the cost model itself. Also note that the design of the Leios protocol itself is under revision. Ask questions <a href="https://discord.com/channels/826816523368005654/1247688618621927505">on Discord</a> or report problems on <a href="https://github.com/input-output-hk/ouroboros-leios/issues">GitHub</a>.</p>
Expand Down

0 comments on commit 00c7466

Please sign in to comment.