Skip to content

build(deps): bump gopkg.in/yaml.v3 from 3.0.0-20210107192922-496545a6307b to 3.0.0 in /tools #388

build(deps): bump gopkg.in/yaml.v3 from 3.0.0-20210107192922-496545a6307b to 3.0.0 in /tools

build(deps): bump gopkg.in/yaml.v3 from 3.0.0-20210107192922-496545a6307b to 3.0.0 in /tools #388

Triggered via pull request November 28, 2023 09:21
Status Failure
Total duration 5m 10s
Artifacts

client.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (ubuntu-latest, 1.19.x)
Process completed with exit code 2.
build (macOS-latest, 1.19.x)
The job was canceled because "ubuntu-latest_1_19_x" failed.
build (macOS-latest, 1.18.x)
The job was canceled because "ubuntu-latest_1_19_x" failed.
build (ubuntu-latest, 1.18.x)
The job was canceled because "ubuntu-latest_1_19_x" failed.
build (ubuntu-latest, 1.18.x)
The operation was canceled.