Skip to content

chore(deps): update dependency make-dir to v5 #9031

chore(deps): update dependency make-dir to v5

chore(deps): update dependency make-dir to v5 #9031

Triggered via push November 14, 2024 19:16
Status Failure
Total duration 1m 22s
Artifacts

node-ci.yml

on: push
Matrix: verify-matrix
workflow-result
0s
workflow-result
release  /  release
release / release
Fit to window
Zoom out
Zoom in

Annotations

10 errors
verify-matrix (22)
Process completed with exit code 1.
verify-matrix (20.6.1)
Process completed with exit code 1.
verify-matrix (22.0.0)
The job was canceled because "_20_6_1" failed.
verify-matrix (22.0.0)
The operation was canceled.
verify
Process completed with exit code 1.
verify-matrix (23)
The job was canceled because "_20_6_1" failed.
verify-matrix (23)
The operation was canceled.
verify-matrix (18.19.0)
The job was canceled because "_20_6_1" failed.
verify-matrix (18.19.0)
The operation was canceled.
workflow-result
Process completed with exit code 1.