Notifications
You must be signed in to change notification settings - Fork 21
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
Set option to force minimum fraction of load served by ASHP if purchased #455
base: develop
Are you sure you want to change the base?
Conversation
@Bill-Becker just a note: this may be a replacement for Failing tests are currently coming from a PVWatts timeout. |
@zolanaj so if we have a scenario that has a peak load of say 100 ton, and we say min service fraction is 50%, then REopt will size ASHP to 50 ton (at least). But if the "typical load" is more like 50 ton, this still allows the ASHP to only serve 50% of the 50 ton, or 25 tons for that typical load? |
@Bill-Becker Slightly rephrasing this: 5f the peak load is 100 ton and every other hour the load is 50 ton, then if purchased, the system would produce a minimum of 50 tons in the peak period and 25 tons in every other period. I'm considering this "option A" and working on a separate option that will serve as much of the load as possible if the system is purchased ("option B" but not in order of preference - just the order of what I'm attempting.) I think that option B is more in line with the ask but this was the easier implementation when I drew it up. |
Ok, yeah that's what I thought - this would work pretty well when the peak-to-typical/avg load ratio is relatively low (<1.5), but I'm concerned this will still lead to a lot of the same kind of "herky jerky" dispatch for higher ratios that we're seeing now because REopt will just do the minimum of what's required if it's not economic with the temp-dependent COP and TOU/demand pricing. |
Added