Skip to content

chore(deps): update dependency crypto-ld to v7 #4499

chore(deps): update dependency crypto-ld to v7

chore(deps): update dependency crypto-ld to v7 #4499

Triggered via pull request January 30, 2025 09:19
Status Failure
Total duration 4m 29s
Artifacts 2

tests.yml

on: pull_request
check_skip
0s
check_skip
cache_imgs
4s
cache_imgs
bundle_cache
26s
bundle_cache
Matrix: test
Matrix: integration_test
Matrix: bundle_test
Fit to window
Zoom out
Zoom in

Annotations

12 errors
test (20, required)
Process completed with exit code 1.
test (22, optional)
The job was canceled because "_20_required" failed.
test (22, optional)
The operation was canceled.
test (18, required)
The job was canceled because "_20_required" failed.
test (18, required)
The operation was canceled.
test (16, optional)
The job was canceled because "_20_required" failed.
test (16, optional)
The operation was canceled.
integration_test (latest, required)
Process completed with exit code 1.
integration_test (latest-develop, optional)
The job was canceled because "latest_required" failed.
integration_test (latest-develop, optional)
Process completed with exit code 1.
bundle_test (latest-develop, optional)
Process completed with exit code 1.
bundle_test (latest, required)
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
build
76.7 MB
checked-nonmin-bundle
892 KB