Notifications
You must be signed in to change notification settings - Fork 3
/
nminusone.mod
158 lines (133 loc) · 5.54 KB
/
nminusone.mod
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
# N minus 1: a MILP minimum network flow problem with (n-1) redundancy
# Last updated: 18 Nov 2016
# Author: [email protected]
# License: CC0 <http://creativecommons.org/publicdomain/zero/1.0/>
#
# USAGE
# glpsol -m nminusone.mod
#
# OVERVIEW
# This model finds the minimum cost network within a graph to redundantly
# connect a set of source to a set of demand points.
#
# NETWORK GRAPH
# (for input data, see bottom of file)
# vi's denote vertices, lines show edges. Numbers show costs for building
# a pipe on that edge.
#
# Source Sink
# ,----. 2 ,----.
# | v1 |-----------------------| v3 |
# `----´ `----´
# | ,-----------------´ |
# 1| ,----. 3 |
# `-----| v2 | |1
# `----´ ,----. |
# `--------| v4 |-----´
# 1 `----´
#
# SETS
# Vertices and edges:
# The network is represented by a set of vertex labels, and a set of unordered
# pairs of these vertices.
set vertex; # {v1, v2, v3, v4}
set edge within vertex cross vertex; # {{v1, v2}, {v1, v3}, {v2, v3}, ...}
# Arcs:
# Each undirected edge {v1, v2} corresponds to a pair directed arcs (v1, v2)
# and (v2, v1).
set arc within vertex cross vertex := setof{
v1 in vertex, v2 in vertex: (v1, v2) in edge or (v2, v1) in edge} (v1, v2);
# Timesteps:
# for each edge in the graph, one contigency timestep 'cont_vi_vj' is created,
# plus one additional timestep 'all', in which all edges are available. In this
# model, this timestep does not change the result, but with an additional
# parameter timestep duration, it could be used to correctly assess operational
# costs over the year.
set time := {'all'} union setof{(v1, v2) in edge} ('cont_' & v1 & '_' & v2);
# PARAMS
# Pipe building costs:
# In this simplified model, only pipe construction incures building costs,
# proportional to the pipe capacity. More generally, source vertices could have
# differing operational costs, pipe construction costs could be split into a
# fixed base for earth works (triggered by variable is_used) and a
# capacity-dependent part (proportional to variable pipe_capacity).
param costs{edge} >= 0; # (EUR/MW)
# Capacity limit:
# Maximum allowable thermal pipe capacity that can be constructed in an edge;
# for simple case studies, this parameter corresponds to the maximum allowable
# pipe diameter
param capacity_upper_limit{edge} >= 0; # (MW)
# Sink or source vertices:
# Each vertex in the graph can either have a (positive) source or a (negative)
# sink or demand of energy. As this simple model does not include losses, the
# sum of source and sink must add up to exactly zero.
param sinksource{vertex}, default 0; # (MW, +=source, -=sink)
# Pipe availability:
# For each contigency timestep, exactly one edge is not available (0), while all
# other pipes are operational. In larger models, this strategy would lead to too
# many contigency cases. In that case, only crucial/central edges might have a
# contigency set. The idea of this parameter can be generalised directly to
# source vertices to require (n-1) redundancy also for all sources.
param is_available{(v1,v2) in edge, t in time}, binary :=
if t == ('cont_' & v1 & '_' & v2) then 0 else 1; # (1=yes, 0=no)
# VARIABLES
var flow{arc, time} >= 0; # actual power flow through pipe (MW) per timestep
var is_used{arc, time} binary; # 1=pipe used in that direction, 0=not used
var pipe_capacity{edge} >= 0; # built pipe capacity
# OBJECTIVE
minimize obj: sum{(v1, v2) in edge} costs[v1, v2] * pipe_capacity[v1, v2];
# CONSTRAINTS
# power flow in and out of vertices is conserved. sinksource is the fixed demand
# or supply of a vertex.
s.t. vertex_balance{v in vertex, t in time}:
sinksource[v]
+ sum{(other, v) in arc} flow[other, v, t]
- sum{(v, other) in arc} flow[v, other, t]
= 0;
# the flow is limited by the edge's installed capacity, which must be chosen
# high enough so that the flows in all time steps can be covered. Parameter
# is_available reduces the effective capacity to zero, once for each edge's
# contigency moment. Thanks to the last two constraints, only one of the
# left-hand side terms can be greater than zero at any time.
s.t. flow_limit{(v1, v2) in edge, t in time}:
flow[v1, v2, t] + flow[v2, v1, t] <= pipe_capacity[v1, v2] *
is_available[v1, v2, t];
s.t. one_direction_only{(v1, v2) in edge, t in time}:
is_used[v1, v2, t] + is_used[v2, v1, t] <= 1;
s.t. limit_flow_by_direction{(v1, v2) in arc, t in time}:
flow[v1, v2, t] <=
is_used[v1, v2, t] * (
if (v1, v2) in edge then capacity_upper_limit[v1, v2]
else capacity_upper_limit[v2, v1]);
# SOLVE
solve;
# OUTPUT
printf "\nCAPACITIES\n";
printf " %-3s, %-3s: %8s\n", "v1", "v2", "cap";
printf "---------------------\n";
printf{(i,j) in edge: pipe_capacity[i,j] <> 0}:
" %-3s, %-3s: %8g\n", i, j, pipe_capacity[i,j];
printf "\n";
printf "\nFLOWS PER TIMESTEP\n";
printf " %-3s, %-3s: %8s\n", "v1", "v2", "flow";
printf "---------------------\n";
for{t in time} {
printf "%s:\n", t;
printf{(i,j) in arc: flow[i,j,t] <> 0}:
" %-3s, %-3s: %8g\n", i, j, flow[i,j,t];
printf "\n";
}
# DATA
data;
param: vertex: sinksource :=
v1 1
v2 0
v3 -1
v4 0;
param: edge: costs capacity_upper_limit :=
v1 v2 1 10
v1 v3 2 10
v2 v3 3 10
v2 v4 1 10
v3 v4 1 10;
end;