Skip to content

fix typo in test workflow #2

fix typo in test workflow

fix typo in test workflow #2

Triggered via push August 19, 2024 16:38
Status Failure
Total duration 36s
Billable time 10m
Artifacts

test.yml

on: push
Matrix: build-dev-test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
build-dev-test (ubuntu-latest, 3.9)
Process completed with exit code 2.
build-dev-test (macos-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
build-dev-test (macos-latest, 3.9)
Process completed with exit code 2.
build-dev-test (macos-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
build-dev-test (ubuntu-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
build-dev-test (macos-latest, 3.8)
The job was canceled because "ubuntu-latest_3_9" failed.
build-dev-test (macos-latest, 3.8)
The operation was canceled.
build-dev-test (ubuntu-latest, 3.8)
The job was canceled because "ubuntu-latest_3_9" failed.
build-dev-test (ubuntu-latest, 3.8)
The operation was canceled.
build-dev-test (macos-latest, 3.12)
The job was canceled because "ubuntu-latest_3_9" failed.
build-dev-test (macos-latest, 3.12)
The operation was canceled.
build-dev-test (macos-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
build-dev-test (macos-latest, 3.10)
The operation was canceled.
build-dev-test (ubuntu-latest, 3.12)
The job was canceled because "ubuntu-latest_3_9" failed.
build-dev-test (ubuntu-latest, 3.12)
The operation was canceled.