You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Running a yaw optimization (Serial Refine) for a wind farm with 21 turbines for wind rose from 1 to 359 every 2 deg and one single wind speed took about 2h on my technical laptop. I would like to run the optimization for 10 or 20 different wind speeds which will take ~ 20h (for 10 wind speeds). Hence, I am wondering if there is any possibility to parallelize Floris 3.0?
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
-
Dear Team,
Running a yaw optimization (Serial Refine) for a wind farm with 21 turbines for wind rose from 1 to 359 every 2 deg and one single wind speed took about 2h on my technical laptop. I would like to run the optimization for 10 or 20 different wind speeds which will take ~ 20h (for 10 wind speeds). Hence, I am wondering if there is any possibility to parallelize Floris 3.0?
Thanks!
Best regards,
Ana
Beta Was this translation helpful? Give feedback.
All reactions