Notifications
You must be signed in to change notification settings - Fork 25
/
SUTRAExample1.out
83 lines (63 loc) · 3.79 KB
/
SUTRAExample1.out
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
*****************
***CASE REPORT***
*****************
Simulation Metadata
----------------------
GEOPHIRES Version: 3.6.3
Simulation Date: 2024-11-11
Simulation Time: 15:22
Calculation Time: 2.100 sec
***SUMMARY OF RESULTS***
End-Use Option: Direct-Use Heat
Reservoir Model = SUTRA Model
Direct-Use heat breakeven price: 1730.66 cents/kWh
Number of Production Wells: 1
Number of Injection Wells: 1
Lifetime Average Well Flow Rate: 16.2 kg/sec
Well depth: 0.6 kilometer
***ECONOMIC PARAMETERS***
Economic Model = Standard Levelized Cost
Interest Rate: 7.00 %
Accrued financing during construction: 0.00 %
Project lifetime: 30 yr
***ENGINEERING PARAMETERS***
Number of Production Wells: 1
Number of Injection Wells: 1
Well Depth: 0.6 kilometer
Pump efficiency: 80.0 %
Lifetime Average Well Flow Rate: 16.2 kg/sec
Injection well casing ID: 7.800 in
Production well casing ID: 7.800 in
***RESERVOIR SIMULATION RESULTS***
Maximum Storage Well Temperature: 30.1 degC
Average Storage Well Temperature: 6.2 degC
Minimum Storage Well Temperature: 4.0 degC
Maximum Balance Well Temperature: 30.5 degC
Average Balance Well Temperature: 15.3 degC
Minimum Balance Well Temperature: 14.0 degC
Maximum Annual Heat Stored: -3.3 GWh
Average Annual Heat Stored: -3.4 GWh
Minimum Annual Heat Stored: -3.4 GWh
Maximum Annual Heat Supplied: 2.5 GWh
Average Annual Heat Supplied: 2.2 GWh
Minimum Annual Heat Supplied: 0.6 GWh
Average Round-Trip Efficiency: 64.4 %
Total Average Pressure Drop: 35.3 kPa
***SURFACE EQUIPMENT SIMULATION RESULTS***
Average RTES Heating Production: 0.25 MW
Average Auxiliary Heating Production: 0.14 MW
Average Annual RTES Heating Production: 2.17 GWh/year
Average Annual Auxiliary Heating Production: 1.21 GWh/year
Average Annual Total Heating Production: 3.39 GWh/year
Average Pumping Power: 2.31 kW
Average Annual Electricity Use for Pumping: 20261.85 kWh/yr
***CAPITAL COSTS (M$)***
Drilling and Completion Costs: 2.42 MUSD
Drilling and Completion Costs per Well: 1.21 MUSD
Auxiliary Heater Cost: 0.21 MUSD
Pump Cost: 0.17 MUSD
Total Capital Costs: 2.81 MUSD
***OPERATING AND MAINTENANCE COSTS (M$/yr)***
Average annual auxiliary fuel cost: 48.59 KUSD/yr
Average annual pumping cost: 1.42 KUSD/yr
Total average annual O&M costs: 50.01 KUSD/yr